Installation of coal shed is a complex process, and the ball grid coal shed installation is even more complicated. When installing, we must be familiar with the structure of the ball grid coal shed, the installation steps, and the precautions in the installation process.
The ball grid coal shed consists of four parts: an arc-shaped steel frame, a reinforced concrete floor, a roof, and a net framework. Before installation, the four parts must be prepared separately before they can be used.
The first step of the ball grid coal shed installation is to install the steel frame. The specific steps are as follows: first, lay out the steel frame parts on the ground and check whether the technical specifications of the steel frame parts meet the requirements. Second, connect the steel frame parts with bolts. Third, install the steel frame foundation. Fourth, mark the position of the steel frame, and then use the anchor to fix the steel frame to the foundation. Fifth, weld the steel frame pieces together. Finally, use a bridge crane to lift the steel frame to the predetermined height and fix it with the anchor and steel bar.
The second step of the ball grid coal shed installation is to install the reinforced concrete floor. The specific steps are as follows: first, check the technical specifications of the reinforced concrete floor parts and then lay them out on the ground. Second, install the reinforced concrete floor foundation, and then use the anchor to fix the reinforced concrete floor to the foundation. Third, use the bridge crane to lift the reinforced concrete floor to the predetermined height and fix it with the anchor and steel bar. Fourth, lay the steel mesh on the surface of the reinforced concrete floor, and then use the concrete to pour the reinforced concrete floor.
The third step of the ball grid coal shed installation is to install the roof. The specific steps are as follows: first, check the technical specifications of the roof parts and then lay them out on the ground. Second, install the roof foundation, and then use the anchor to fix the roof to the foundation. Third, use the bridge crane to lift the roof to the predetermined height and fix it with the anchor and steel bar. Fourth, install the roof insulation material and waterproof material.
The fourth step of the ball grid coal shed installation is to install the net framework. The specific steps are as follows: first, check the technical specifications of the net framework parts and then lay them out on the ground. Second, install the net framework foundation, and then use the anchor to fix the net framework to the foundation. Third, use the bridge crane to lift the net framework to the predetermined height and fix it with the anchor and steel bar. Fourth, spread the steel mesh on the surface of the net framework, and then use the concrete to pour the net framework.
In the ball grid coal shed installation process, there are several points of attention to be noted. First, the technical specifications of the steel frame, reinforced concrete floor, roof, and network frame must be checked and must meet the requirements. Second, during the installation process, the bolts must be tightened to ensure that the parts are firmly connected. Third, the installation height of the steel frame, reinforced concrete floor, roof, and network frame must be measured accurately to ensure the safety of the coal shed. Fourth, the insulation material and waterproof material must be installed correctly to ensure the service life of the coal shed.
In short, the installation of the ball grid coal shed is a complex process and requires professional installation personnel. When installing, we must pay attention to the technical specifications of the parts and the installation steps, and also pay attention to the safety precautions in the installation process.
Precautions for the installation of steel structure of spherical grid
Requirements for Steel Pipes and Accessories Used in Spherical Netting Coal Sheds
Structural characteristics of coal shed